Engineering and Geological Studies Completed on the BRAP

 

  • Surface sampling for aggregate assessment

  • Site geological mapping and characterization

  • Core drilling for subsurface aggregate assessment

  • Engineering/Geologic testing and characterization

  • Mine modeling

  •    

  • Surface Sampling in the Bald Ridge Area

  • The initial study began with collecting surface
  • samples along easily accessible areas.
  • Samples collected along Fish Hatchery Road and along interior of project area.

  • Samples tested for material quality as aggregate.

  •